Aluminum Extrusion Ceiling Aluminum Profile Aluminum Profile For Stretch Ceilings Pop Ceiling Designs

Place of Origin:
Guangdong, China
Grade:
6000 Series
Temper:
T3-T8
Application:
aluminum ceiling profile
Shape:
square/rectangle/round/flat/angle
Alloy Or Not:
Is Alloy
Model Number:
Intop
Brand Name:
Intop
Tolerance:
±5%
Processing Service:
Bending, Decoiling, Welding, Punching, Cutting
Delivery Time:
15-21 days
Thickness:
0.7/0.8/0.9/1.0mm etc
Accessories:
door closer/hinges/roller/handles/locks/screws/blind rivets
Color:
silver/champagne/bronze/black
Surface treatment:
anodized/powder coated/polished/woodened
Length:
2.5m/3m/5m/5.8m/6m
Supply ability:
30000 tons/year
Lead time:
15-20 days
Customer brand and logo:
YES
Small profiles insert:
YES

Product Description

Our factory owns complete production lines from aluminum rods casting to the aluminum profiles deep processing:

1. Our extrusion process produces high quality mill finish aluminum profiles. All profiles come out smooth and uniform because of our carefully monitored production process. The extrusion dies are carefully maintained so they enhance the smoothness of the profile surface.

2. Pre-treatment method of sand-blasting, mechanical polishing, brushing would be done before anodizing and powder coating, it offers more stylish choices like bright or matt surfaces for the raw extruded profiles, and the most important thing is to terminate the extrusion lines, remove the surface dirt and oil stains.

Q1: Can I visit your factory?

A: YES, welcome to visit us, our factory is located in non-ferrous industrial base, qingchen district, qingyuan city, guangdong, China. We would be pleased to pick you up from Baiyun airport or Guangzhou Nan high-speed train station or your hotel address in Guangzhou.

Q2: How to ensure the quality of aluminium profile I purchased?

A: We have professional inspection team to check the quality, starting from mill finish profiles extrusion, our QC will pick out any potential inferior profiles with mechanical lines, then for anodizing or powder coating etc. When the order is finished and ready for shipping, testing report will be done by QA for PASS.

Q3: How long it takes to finish the order?

A: Our production capability per month over 2000 tons, it takes about 20 days to get ready for a 40HQ container ready. But for the first new order, as the new moulds are needed to be created and tested normal, would last a month or so.

Q4: What is the payment terms?

A: Usually we prefer T/T deposit and balance payment against B/L copy, and L/C is also very common.