Extruded aluminum frame anodized surface treatment wardrobe aluminum profile for wardrobe

Place of Origin:
Guangdong, China
Grade:
6000 Series
Temper:
T3-T8
Application:
wardrobe aluminum profiles
Shape:
square/rectangle/round/flat/angle
Alloy Or Not:
Is Alloy
Model Number:
Intop
Brand Name:
Intop
Tolerance:
±5%
Processing Service:
Bending, Decoiling, Welding, Punching, Cutting
Delivery Time:
15-21 days
Thickness:
0.7/0.8/0.9/1.0mm etc
Accessories:
door closer/hinges/roller/handles/locks/screws/blind rivets
Color:
silver/champagne/bronze/black
Surface treatment:
anodized/powder coated/polished/woodened
Length:
2.5m/3m/5m/5.8m/6m
Supply ability:
30000 tons/year
Lead time:
15-20 days
Customer brand and logo:
YES
Small profiles insert:
YES

Product Description

Aluminum Profiles, Aluminium Profiles, Aluminum Extrusion Profiles, Aluminum Alloy Profiles, Aluminum Profiles Supplier, Custom Aluminum Profiles

We offer many kinds of surface treatments to our customers, and the aluminum profiles will be more resistant to chemicals, moisture, ultraviolet light, or some extreme weather conditions. It will also reduce the risk of chipping, corrosion, scratches, peeling or fade.

Q1: Can I visit your factory?

A: YES, welcome to visit us, our factory is located in non-ferrous industrial base, qingchen district, qingyuan city, guangdong, China. We would be pleased to pick you up from Baiyun airport or Guangzhou Nan high-speed train station or your hotel address in Guangzhou.

Q2: How to ensure the quality of aluminium profile I purchased?

A: We have professional inspection team to check the quality, starting from mill finish profiles extrusion, our QC will pick out any potential inferior profiles with mechanical lines, then for anodizing or powder coating etc. When the order is finished and ready for shipping, testing report will be done by QA for PASS.

Q3: How long it takes to finish the order?

A: Our production capability per month over 2000 tons, it takes about 20 days to get ready for a 40HQ container ready. But for the first new order, as the new moulds are needed to be created and tested normal, would last a month or so.